CASE STUDY : Radnor Hills Mineral Water




Radnor 1 Radnor 2



High Performance...

Coatech was awarded the work to Radnor Hill’s new production areas. In total three new floors were installed over a few months to fit in with their very strict programme of development

Coatech visited site on many occasions and liaised with management on the requirements for the bespoke drainage channels to suit their needs

Firstly, the heavy-duty, bespoke drains were set in using fast-cure concretes. The concrete was left to cure and then the surfaces were prepared, primed and overlaid with new 9mm chemical resistant screed in various colours

The result was Radnor Hills was left with three new heavy duty, decorative screeds, to withstand the very harsh, wet environment for many years to come