CASE STUDY : Rhyl Drift Park




Resin Bonded 4 Rhyl Prom 2 Rhyl Prom 3 Rhyl Prom 4



Complete… Rejuvenation…

As part of the regeneration project of the West End of Rhyl, North Wales, BCA Architects of Liverpool were commissioned to design a new park on the Promenade

To enhance the appearance of the Promenade and Pathways, BCA specified a Natural Resin Bonded Stone finish, this to be Golden Pea Gravel to the main area and Staffordshire Pink to the Cycle Paths. Given the nature of the existing finish on the Promenade, a mixture of concrete, broken ,cracked Tarmac etc. this was first “planed” off and a new black Macadam finish applied

The surfaces were first mechanically swept by Coatech Ltd and lightly Heat Blasted with Hot Compressed Air to burn off any remaining oil or contamination. The entire area, some 7,000m2. was then primed with HAPAS Approved Rocbinda Resin, and then coated with Decorative Resin Bonded Stone using 1-3mm Golden Pea Gravel & 1-3mm Staffordshire Pink aggregate for the Cycle Paths


What next?

If you require any other assistance we are happy to answer any questions. Please call us on 01745 887381 or request a call back.