Light Green

Case Study


Christ the Word School

Coatech was delighted to be involved on this project right on our doorstep

When the existing area was wet, the area was awful and unusable so the school needed an urgent upgrade

Coatech installed a new 50mm SBR base topped with a new green EPDM topping in total installing 300 over the Easter shutdown for the local school

 


 

PROJECT: Christ the Word Catholic School
SECTOR: Education
CLIENT: Adever 

SIZE:  300m²
PRODUCT: Green EPDM Rubber Crumb

Before After

We’d love to work with you on your next project

Get in touch