Pecan

Case Study


Llyn Tegid

We were delighted to be involved in phase 2 of the flood defence works here at Bala Lake. After our first phase of works were completed in the summer of 2022, we returned in January of 2023 to complete the final 162m² of Resin Bound Stone surfacing.
In total on this site we have installed 662m² of 30mm thick Addagrip Terraco Pecan blend.


PROJECT: Bala Lake 

SECTOR: Commercial

CLIENT: Private

SIZE: 172m²

PRODUCT: Resin Bound Stone