Case Study
Arla Foods
Llandyrnog Creamery asked Coatech if we could help with a problem with one of their main production room floors
The old tiles were broken and loose and the Cementitious underlayment was failing due to attack from the pH of the milk from the pasteurisation process
Given the limited ‘shutdown’ period available, the work had to be completed in only seven days to avoid disruption to the client’s production
The loose, broken tiles were first removed to expose the failing substrate, the failing substrate was then removed to expose the Concrete base
Coatech then installed an Epoxy D.P.M and onto this applied a new Fast-Cure S.B.R. Cementitious sub-base, some 16 tonnes of new screed! This was installed to falls to promote good drainage to drainage channels
The new screed was lightly ground to provide a key, primed with Epoxy Primer and then overlaid with a heavy duty 6mm thick Polyurethane screed
The floor was finished off with Polysulphide expansion joints along the drain to match the floor
The new surface will meet the rigorous health, safety and hygiene demands of a modern food manufacturing environment and withstand the aggressive pH conditions and cleaning methods
PROJECT: Main production room floors, Llandyrnog Creamery
SECTOR: Food Manufacture
CLIENT: Arla Foods
SIZE: 560m²
PRODUCT: Epoxy D.P.M, SBR Polymer Screed, Resdev R.T. Polyurethane Screed Topping (Resdev)