E: [email protected] T: +44 (0) 1745 887381
Coatech was delighted to be involved on this project right on our doorstep
When the existing area was wet, the area was awful and unusable so the school needed an urgent upgrade
Coatech installed a new 50mm SBR base topped with a new green EPDM topping in total installing 300m² over the Easter shutdown for the local school
PROJECT: Christ the Word Catholic School
SECTOR: Education
CLIENT: Adever
SIZE: 300m²
PRODUCT: Green EPDM Rubber Crumb
We’d love to work with you on your next project
Get in touch