Case Study


Grosvenor Park, Chester

Coatech was delighted to be involved in the re-surfacing work to the pathways at the prestigious Grosvenor Park in Chester for Balfour Beatty

The surface was originally specified as ‘tar and chip’ but after close discussions with the client, Resin Bonded Stone was proposed as a more suitable option, given the product’s longevity and fully bonded nature

A Staffordshire Pink 2-5mm aggregate was chosen to complement the surrounding areas and in all 10,198m² of Resin Bonded Surfacing was installed

 


 

PROJECT: Grosvenor Park, Chester

SECTOR: Public Realm 

CLIENTGround Control 

SIZE: 10,198m²

PRODUCT:  2-5 mm Staffordshire Pink; Resin Bonded Stone