Mid Grey

Case Study


Llandrillo College Kitchen

 

Coatech was involved in this kitchen refurbishment project quite local to our offices

The existing resin floor was not performing properly and other areas of vinyl and ceramic tiles needed removing

Coatech removed all these existing finishes via various methods and prepared the area for the new 9mm screed and coving

The entire area then received new Altro PU flooring throughout in grey to provide this college with the hardwearing floor they required

 


 

PROJECT: College

SECTOR: Commercial

CLIENT: Private

SIZE: 160m²

PRODUCT: Chemical Resistant Screed

We’d love to work with you on your next project

Get in touch